IMEG partnered with a top-tier manufacturer of industrial pumps to perform a detailed capacity utilization analysis on a complex, 7,000 sq. ft. assembly line consisting of multiple production stages. The objective was to streamline resource usage, reduce bottlenecks, and optimize throughput across the entire line.
IMEG deployed a structured resource planning approach that included: